Link rule:
Trip schedule in fixed weekly slots, every 14 days per rake
IA = every 4th trip
IC = every 3rd IA (12th trip)
· Anchored to DOC of 12-coach MEMU: 26-Mar-2026 (Thu)
Schedule maintenance activities per RDSO Report No. RDSO/PE/EMU/0038-2021 (Rev. 02) dated 24.06.2024
(issued with RDSO letter EL/4.6.1/3-phase dated 06.07.2024). Annexure-1: conventional EMU/MEMU ·
Annexures 5 & 6A: three-phase · Annexure-9: bio-toilets. POH activities per Annexures 3, 7 & 8.
Rake-level warranty runs from the date on record + warranty period (default 24 months — edit per rake as per the supply
or POH contract). For the two 8-coach rakes that date is the commissioning date after POH, so the warranty shown
is the post-POH workmanship warranty, not an original-build warranty.
Add equipment-level warranties (batteries, VCB, converters, RMPU etc.) below.
🛡️
Import Equipment Warranties from Excel / CSV
Upload an Excel file (.xlsx, .xls) or CSV with equipment warranty records.
Rake Warranty Status
| Rake / Train | Basis | Date | Warranty (months) | Expires | Status |
Add Equipment Warranty
| # | Equipment | OEM | Rake/Coach | Start | Expires | Status | Remarks | Action |
No equipment warranties added yet.